YİBİTAŞ - LAFARGE
INC. / Yozgat Cement Factory |
|
Application: |
Preheather
and Rotary Kiln Renovation Project |
| Contractor: |
Handar
Çelik Konst İml. İnş. Ltd. Şti, |
| Sub
Contractor: |
|
| Date:
|
May-June
2005 |

As a consequance of the close
relations and confidence generated following the meetings and discussions for
several projects, Handar Ltd. declared that they would like to work with CKV and
asked the selection of necessary cranes.

The project can be summarized as;
the renovation of cyclones and kiln and assembly of all related
components.

The full
resposibility of Handar Ltd. with production and assembly , the
standarts of job provider and time pressure led to a keen
handling of the project.
The
cranes proposed by CKV and sent to jobsite after the mutual agreement were ;
Liebherr LTM 1220 and LTM 1120. Demag Ac 1600 was also at jobsite as a support
to handle some critical lifts.
As
one part of the project four cyclone groups have been renovated.
The components in these groups were between 4-13 tons. The
lifting elevations varied between 30-68 m. and pieces were to be
displaced between colums of 10 m. apart.
Additonally 13
pieces related to the gas ducts were also assembled at same
elevations.
On the other hand,
when the operations on the kiln (50 t.) are considered; it had
to be placed on saddles to start the revisions . From diffrent
sections pieces weighing between 8- 10 tons were cut out to be
replaced with new materials.




All cranes that
took part in the project have completed their jobs with success.
Besides , the service and maintenance team of CKV has made the
interventions at right times to avoid any problem and delays.
The project was
completed almost 45 days.
|