ANKARA - ISTANBUL MOTORWAY CONSTRUCTION

 Application:

 Placement of viaduct frames between Kaynaşlı & Bolu Mountain Tunnel
 Contractor:  ASTALDİ SpA
 Sub Contractor:  Simge İnşaat Müh. Mnt. San. Tic. Ltd . Şti.
 Date:  December 2004 - January 2005

 

CKV, has been giving all services and crane back up for all projects realized by simge Const. Ltd. Thus, being appointed also for this project in order to carry out the jobs CKV has made all initial studies (site investigation, crane selection, etc.)  and was at the site at the right time.

 

 

 

 

 

Being 20  units the steel frames had 84 t. average weights with dimensions as; 5 x 5 m. and L= 22 m.  Meanwhile, Demag  AC 1600 was planned to be employed being the most suitable crane when the lifting height of ave.  50 m. (47 - 51m.) was considered.

 

 

 
The expirenced teamof CKV has completed the job with a succesful performance and let the pieces be placed at their locations without and damage, under the adverse conditions of winter.

 

 

 

 

 

 

 

 

 

 

 