ANKARA - ISTANBUL
MOTORWAY CONSTRUCTION |
|
Application: |
Placement of
viaduct frames between Kaynaşlı & Bolu Mountain Tunnel |
| Contractor: |
ASTALDİ
SpA |
| Sub
Contractor: |
Simge
İnşaat Müh. Mnt. San. Tic. Ltd
. Şti. |
| Date: |
December 2004
- January 2005 |

CKV, has been giving all services
and crane back up for all projects realized by simge Const. Ltd. Thus, being
appointed also for this project in order to carry out the jobs CKV has made all
initial studies (site investigation, crane selection, etc.) and was at the site
at the right time.
Being
20 units
the steel frames had 84 t. average weights with dimensions as; 5
x 5 m. and L= 22 m. Meanwhile, Demag AC 1600 was planned to be
employed being the most suitable crane when the lifting height
of ave. 50 m. (47 - 51m.) was considered.

The
expirenced teamof CKV has completed the job with a succesful
performance and let the pieces be placed at their locations
without and damage, under the adverse conditions of winter.


 |