ALGERIA/ARSEW PROJECT

 Operation:

 Power Plant Cooling Water Pipeline
 Contractor:  TAISEI CORPARATION
 Sub Contractor:  ALSİM ALARKO San. Tic. A.Ş.
 Date:  2004 - 2005

Consudering the project requirements and following the approval of Alarko Liebherr LT1250 has been proposed by CKV as the crane to be put in the operation.

 

 

 

 

The cooling water pipeline necessary for the Power Plant was constructed with the special pipes manufactured at job site.

 

The data for the pipes were;

Diameter: 1,5 m.

Lenght: 12 m.

Weight: 100 t. dur

Total weight per each operation reached up to almost 105 tons when the special lifting apparatus is taken in to account.

Considering additional jobs to be done as per the requirement from CKV, Liebherr LT1250 has been sent to site and was in operation almost a year. 

 

 

 

 

 

 

 

 

 

 

 

 