ALGERIA/ARSEW PROJECT |
|
Operation: |
Power Plant
Cooling Water Pipeline |
| Contractor: |
TAISEI
CORPARATION |
| Sub
Contractor: |
ALSİM
ALARKO San. Tic. A.Ş. |
| Date:
|
2004 -
2005 |

Consudering the
project requirements and following the approval of Alarko
Liebherr LT1250 has been proposed by CKV as the crane to be put
in the operation.
The cooling water pipeline
necessary for the Power Plant was constructed with the special pipes
manufactured at job site.
The
data for the pipes were;
Diameter: 1,5 m.
Lenght: 12 m.
Weight: 100 t.
dur
Total weight
per each operation reached up to almost 105 tons when the
special lifting apparatus is taken in to account.
Considering
additional jobs to be done as per the requirement from CKV,
Liebherr LT1250 has been sent to site and was in operation
almost a year.




|